- designed by Skidmore, Owings and Merrill and CPG Corporation
- began in 1999, at an estimated cost of about S$1.75 billion
- 380,000 square meters (4 million sq ft)
- natural lighting from the 919 skylights
- positioning air-conditioners nearer to floor-level
- 5-storey high wall of hanging plants to regulate the internal temperature of the terminal with the occasional misting
- a butterfly garden
- koi ponds dotted throughout
http://www.enn.com/top_stories/article/28926
http://www.changiairport.com/changi/en/airport_guide/exp_changi/index.html
http://en.wikipedia.org/wiki/Singapore_Changi_Airport
No comments:
Post a Comment